The snow cover has already drifted, the masonry is drying slowly, the mud in the vicinity of the construction site is slowly curing, and the long-term weather forecast promises to keep temperatures above the freezing point even at night. A few administrative measures and we can continue. The decisive date for commencement of construction works on the half-timbered house, which extends the exhibition of the Museum of Ore Mountains in Lesná, was set on Monday 23 April 2018. The construction of the 2nd floor – the half-timbering, which will be the dominant feature of this replica of the building. You can view photos from the building site at the photo gallery.
New York
3°
Feels like: 3°CFair
6:32 am5:44 pm EDT
Wind: 0km/h SSE
Pressure: 1021.67mbar
UV index: 0
SatSunMon
10/2°C
4/-6°C
1/-3°C
4/-6°C
1/-3°C
Kalendář
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Feb | ||||||
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | |