The snow cover has already drifted, the masonry is drying slowly, the mud in the vicinity of the construction site is slowly curing, and the long-term weather forecast promises to keep temperatures above the freezing point even at night. A few administrative measures and we can continue. The decisive date for commencement of construction works on the half-timbered house, which extends the exhibition of the Museum of Ore Mountains in Lesná, was set on Monday 23 April 2018. The construction of the 2nd floor – the half-timbering, which will be the dominant feature of this replica of the building. You can view photos from the building site at the photo gallery.
New York
12°
Feels like: 11°CCloudy
5:49 am7:55 pm EDT
Wind: 10km/h ESE
Pressure: 1026.08mbar
UV index: 0
SunMonTue
13/12°C
24/15°C
25/15°C
24/15°C
25/15°C
Kalendář
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« Feb | ||||||
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |